Salvus to Galloway Maintenance Project
PNG is conducting infrastructure maintenance to repair and replace sections along an 80-kilometre segment of the eight-inch (219.1 mm) diameter Western Transmission gas line between the Salvus maintenance yard and the Galloway pressure regulating station.

Proposed PNG Reactivate Capacity Project
PNG is working to reactivate capacity on the Western Transmission Gas Line, enabling the delivery of increased natural gas volumes to meet the supply required for new industrial customers.